What does project management include?
A written scope baseline, programme and budget tracking, variation control before spend moves, on-site trade coordination, and milestone photo reporting — with one accountable lead so owners approve decisions without managing subcontractors day to day.
How does remote project management work for overseas clients?
You receive a dedicated project manager, regular photo and video updates at each milestone, budget tracking, and direct WhatsApp and video-call access — so you approve decisions without travelling to site.
What reports do I receive during a project?
Milestone reports include dated site photography, progress against programme, budget status, and outstanding decisions requiring your approval.
What should be included in a weekly construction report?
A consistent weekly pack should cover an executive summary, progress against programme, labelled dated photos or video, open risks, decisions waiting on your approval, variation status, and next-week priorities. Major gates — structure, MEP, finishes, snag — get fuller milestone reports before the next payment stage.
How do construction milestone payments work?
Payments follow a phased schedule written into your proposal and tied to measurable gates — typically after scope approval, then after structure or MEP hold points, finishes packages, and snag close-out. Exact stage amounts are confirmed in writing for your programme; we do not ask for full payment up front or invent generic percentage schedules.
How are variations controlled?
Every change is logged against the baseline with cost and programme impact. Work that expands scope does not proceed until you approve the variation in writing. For the after-start playbook — variation vs defect, who may sign, and handover filing — see the construction variation order Syria guide.
Can HYMRO manage a project started by another contractor?
Yes. We can take over existing programmes — conducting a site audit, documenting current status, and establishing a recovery plan with clear milestones and accountability.
Who do I speak to day to day?
One bilingual project manager owns the programme. Site trades report through that lead — you are not asked to manage multiple subcontractors yourself.
What is the difference between site supervision and project management?
Site supervision (الإشراف على البناء) checks that site work matches drawings and hold points. Project management also owns the written baseline, budget, variations, weekly and gate reports, and handover records. Public-tender contractor classification grades do not replace those artefacts on a private villa or office.
What does construction supervision in Syria include?
Construction supervision covers on-site checks that work matches drawings, hold-point inspections before covering trades, snag evidence, and photo records you can audit. HYMRO delivers that inside project management — not as a thin separate supervision page — alongside weekly packs, variation control, and bilingual reporting for owners in Syria and abroad. See our process page for how day-to-day إشراف sits between written gates.
Who checks quality if HYMRO also builds?
The same lead owns sample lock, hold-point inspections, and snag close-out with photo evidence you can audit. If you want a separate third-party inspector, we can work alongside that report — we do not claim independence we do not have.
How does a project-management engagement begin?
Send the property location, current drawings or photos, and whether you need PM on a HYMRO build or a takeover of another contractor’s site. We reply within one business day of a complete brief with what a scoped PM proposal will lock — baseline, reporting weekday, and who may approve variations.
What does project management not automatically include?
Legal or power-of-attorney work, a third-party inspector unless you appoint one, and construction trades or materials unless those sit on a parent service proposal. Payment stage amounts are written into your programme — we do not publish a generic percentage chart.